NEW · Issue #001 is out · Free every Saturday

The AI boom runs on watts & water.

A weekly newsletter for people breaking into AI infrastructure, written by an engineer who builds the equipment. Read it on Substack, then come here to play the weekly Sudoku and crossword and follow the startups worth watching.

RB
Revati Borkhade · Industrial Engineer building chillers for hyperscale AI data centers. 15+ peer-reviewed papers, 2 patents.
This Week's Games

Play, score, brag

Answers to both puzzles come out in Issue #002. Share your score with #WattsAndWater.

Sudoku #001

Fill every row, column and 3×3 box with 1–9. Your score starts at 1,000 and drops with time and rule-breaking entries. Finish fast and clean.

Time
0:00
Errors
0
Best
—

Scoring: 1,000 points, minus 1 point every 3 seconds, minus 25 points for every entry that breaks a rule. Clashes turn red right away.

🔒 The full solution comes out in Issue #002. No peeking.

The Reader's Crossword #001

Every answer is in Issue #001. Read it on Substack cover to cover and you can solve all 12. Click a clue or a square, then type.

Solved
0/12
Checks
0

Across

    Down

      🔒 Full answers in Issue #002. Each check shows only which words are right.

      The Pulse

      Four numbers to know

      The figures setting the pace of the buildout, each linked to its source.

      Big-4 hyperscaler capex, Q3 '26
      $201.9B
      ▲ 108% vs Q3 2025
      Company 10-Qs · Walnut
      US data center grid demand, 2026
      75.8 GW
      → 134.4 GW forecast by 2030
      451 Research · Yahoo Finance
      Avg rack power density
      27 kW
      ▲ from 16 kW in 2025
      AFCOM 2026 · BixBit
      Raised by Torus this week
      $500M
      for prefab AI data centers
      Torus · Tech Times
      Start Here

      New? Twenty years in four eras

      If you're new, read this once. Every story we cover fits somewhere on this line.

      2006 – 2011

      The cloud era

      AWS launches in 2006 and computing becomes something you rent. Data centers are mostly air-cooled, and racks draw about 5–10 kW. Facebook founds the Open Compute Project in 2011 to share efficient designs.

      Rack ≈ 5–10 kW
      2012 – 2019

      Hyperscale & the GPU spark

      In 2012, AlexNet shows deep learning works when it's trained on GPUs. Hyperscalers build ever-larger campuses and chase better PUE. NVIDIA ships its first DGX AI system in 2016.

      Campus ≈ 100 MW
      2020 – 2024

      The AI shock

      The A100 (2020) and H100 (2022) push chip power up fast, and ChatGPT launches in late 2022. In 2024, NVIDIA's rack-scale Blackwell systems need around 120 kW per rack and liquid cooling.

      Rack → 100 kW+
      2025 – now

      Gigawatts & power islands

      The first gigawatt campuses arrive. Power, not chips, becomes the bottleneck. Big-4 capex passes $200B a quarter, and liquid cooling becomes standard for AI.

      Campus → 1 GW+
      💡
      The one-line lessonEvery era multiplied the power per rack, and every jump turned a facilities problem (power, cooling, supply chain) into the real bottleneck. That's why AI infrastructure needs engineers, not just coders.
      Startup Watchlist

      Who's raising, and who to follow

      Where venture money flows tells you which problems the industry thinks are worth solving next.

      THIS WEEK
      $500M
      Torus · Utah
      Led by Magnetar · Nov 2026

      Launched Foundry, factory-built AI inference units of 1–20 MW. Torus says they go live in 12–16 weeks by using spare grid capacity instead of waiting in the queue. Torus also says the closed-loop cooling is waterless.

      Source: Tech Times
      LAST 3 WEEKS
      $108M
      Peak Energy · California
      Series B · Led by GM Ventures · Oct 22, 2026

      Makes passively cooled sodium-ion battery storage and is now moving into data centers. The company says it has more than $1B in customer orders to fill.

      Source: ESG Today

      The Watchlist ⭐

      Tap Follow to track a startup. We'll flag its news in future issues on Substack.
      Startup
      What they do
      Category
      Last round
      Words of the Week

      Say it like an insider

      Tip: a couple of these show up in the crossword.

      Power Usage Effectiveness PUE

      Total facility power ÷ IT power. 1.0 is perfect. Everything above 1.0 is mostly cooling and power-conversion overhead.

      Capital expenditure Capex

      Money spent on long-lived assets such as buildings, chillers, turbines and GPUs. It's the number everyone watches on earnings day.

      Chiller

      A machine that makes cold water using a refrigeration cycle. It's the heart of most data center cooling plants, and it's sized in tons (1 ton = 3.517 kW of heat removed).

      Direct-to-chip cooling DLC

      Cold plates sit on top of the GPU and carry liquid through it. It's needed once racks pass roughly 50–100 kW.

      Behind-the-meter BTM

      Power made on-site and used directly, bypassing the utility grid and its interconnection queue.

      Two-phase cooling

      The coolant boils as it absorbs heat, and the vapor carries the heat away. ZutaCore and Accelsius both build this kind of system.

      The weekly issue

      One email every Saturday. Fifteen minutes. Smarter by Monday.

      Built for engineers, students and career-switchers getting into AI infrastructure. Free on Substack.

      • 3 stories with the backstory and why they matter
      • Startups that raised, and a watchlist to follow
      • Podcasts and a video for the week
      • A new Sudoku and crossword, plus last week's answers
      Subscribe on Substack →